San Diego, CA | 2024 - Present
284 Design Build B-1457 Repair Damages to Building Caused by Fire Pipe Break, Naval Base Coronado, CA
Project includes all design, demolition, and construction to return 1st floor of NBC 1457 to a functional administrative space for Helicopter Sealift Command (HSC 21 and HSC 23). Project is considered a major renovation. Project includes HAZMAT abatement as needed. Building experienced flooding in 2022 when high pressure fire riser burst and flooded facility. Bathroom slab, in immediate vicinity of the rupture, was badly damaged, exposing the underground utility runs that feed compressed air and steam to NBC 340 (Hangar). Bathroom fixtures were demolished or removed from flood impacted bathroom. Water also damaged walls, floor finishes, electrical outlets, and IT communications throughout first floor.
In addition to flood damage, facility needs seismic upgrades. Existing electrical system does not have enough capacity for modern day office. Ceiling has conflicts between sprinkler heads and ceiling mounted obstructions that need to be resolved as well as inadequate seismic bracing. Fire alarm system is needing to be replaced. Data communications have been damaged . HV system and POTS phone system are functional. Interior finishes are degraded. HAZMAT is present in many areas. Many windows are broken or boarded up. Bottom tracks of metal stud walls are rusting from being under water.
Twentynine Palms, CA | 2024 - Present
281 Design Build TP21016M Repair Phelps Hall Dining Facility, Twentynine Palms, CA
Building 1460 is a 31,000 SF Dining Facility (DFAC) and is required to accommodate feeding Marines aboard the Installation. With a seating capacity of 576 personnel, on a typical day, this facility is required to serve approximately 1728 meals, three times per day, 7 days a week. This project includes the Design and Construction of the mess hall and repairs all related management, supervision, quality control, labor, equipment, and materials to provide a complete and usable facility at Marine Corps Air Ground Combat Center (MCAGCC) Twentynine Palms, CA. In addition, the project will include repairs to the following priority areas: the entrance, dining area, circulation, galley, roofing and telecommunications for the B-146 Phelp DFAC.
Bremerton, WA | 2023 - Present
280 Design Build Remodel Second Floor & Add Passenger Cargo Elevator, B434, NBK Bremerton, WA
Building 434 is a 2-story and basement 21,708 square foot building consisting of a reinforced concrete structure. The basement level has exposed concrete exterior walls while the 1st and 2nd story have brick veneer over concrete. The project includes the remodeling of the entire 2nd floor in Building 434 in support of increased JCAB (JAG Consolidated Administrative Business) footprint. This area will primarily consist of administration work areas and offices.
San Diego, CA | 2023 - Present
279 Design Build NABSD-602 Renovate Bldg. RM18-1628 at SNI, Naval Base Coronado, CA
B602 is a three story 20,577 Unaccompanied Housing (UH) facility constructed in 1969 and located along the ocean front at the Silver Strand area of Naval Base Coronado. The current B602 consists of 41 sleeping rooms (4-person rooms/164 beds) with a laundry room on each floor. The project will convert an existing Administrative Office into a sleeping room to increase the total to 42 (168 beds). The existing building is in poor condition due to heavy wear and tear and exposure to the harsh marine environment and requires comprehensive renovation work to bring it up to current code and life safety standards. The building was last renovated in 2005 and most of the systems installed and remaining have passed their effective service life. The complete renovation of B602 is intended to extend the service life of the building for 25 years while eliminating ongoing deterioration of the building structure from water infiltration. The scope includes a new Elevator, Elevator Vestibules, Elevator Machine Room, and an Electrical Room designed to meet applicable codes and FC / UFC requirements. This project also includes modifications at the Mechanical Room in B605 to replace the domestic hot water system including heaters, storage tank, controls, and accessories.
Silverdale, WA | 2023 - Present
278 Design/Bid/Build Modernize Electrical Substation Five, Bangor, WA
The scope of work associated with this project (Substation 5) requires 115kV substation upgrades, 15 kV switchgear replacement with two high breaker cubicles, new protective relays, protective device coordination, SCADA integration, installation of raceways, wire, and fiber optic cabling systems, new capacitor bank, and battery replacements. Additionally a new 115-kV transmission line bypass of Sub.5 is included.
Everett, WA | 2023 - Present
275 Design Build Repair Electric Distribution Service SW-6, Naval Station Everett, WA
Work includes: Provide design services and installation of a new 5-way, high voltage, electrical distribution switch known as SW-6, manhole dewatering, design and CAD service, demolition and disposal of existing structures, new concrete pad, new manhole(s), new switchgear, and site restoration. Work shall also include provision of temporary power during demolition, construction, and disposal of existing switch, etc. and replacement of various feeder cables in order to facilitate installation of the new switch.
Point Mugu, California | 2021 - Present
268 Design/Build Special Project RM17-1448, Repair PM373 for NAWSCWD, NBVC Point Mugu, CA
Building PM373 will require demolition of the existing structure, renovation, repair, and modernization to accommodate administration and laboratory space requirements for NAVAIR. The entire structure shall be demolished, leaving the pre-engineered structural skeleton to remain. The renovation approximately 12,000 gross square feet, will include break room, test lab, offices, VTC Rooms, IT Lab, discussion room, terminal room, and support spaces. The project will require new mechanical, electrical, plumbing, and telecommunications.