246 Design/Build Renovate Bldg. 302, Naval Base Point Loma, CA

November 18, 2015 by Lauren Zimmermann

2014-2016

This is a design/build project providing renovations to Building 302 at Naval Base Point Loma, San Diego. Building 302 is a seven story, permanent housing facility constructed in 1974. Each floor level contains three living units. Each living unit has a shared lounge and 4 sleeping rooms accessed from the lounge. There are a total of 84 sleeping rooms. Five sleeping rooms and adjoining restrooms will be made ABA compliant.

Each living unit is accessed by a walkway along an inner courtyard. Floor levels are vertically connected by two elevators located at Stair #3. Stair #2 has roof access ladder and hatch located at seventh floor landing.

In addition to the renovations to Building 302, upgrades to a second floor Mechanical / Electrical Room located in Building 300 have been identified. Building 300 is located northwest of Building 302, and contains laundry, lounge and office areas on the first floor, and Mechanical, Electrical, Telephone and Security services on the second floor.

img_2952

img_1278 B302

img_1287 B302

img_1259 B302

Filed Under: Complete Tagged With: 246

245 Design/Build Repair Auto Org Shop 1816, 29 Palms, CA

November 18, 2015 by Lauren Zimmermann

2014 – 2016

Building 1816 is a tilt-up concrete building constructed in 1981 as an organizational maintenance facility for various Marine Corps tactical units stationed at the Marine Corps Air Ground Combat Center (MCAGCC). The facility supports the mission of MCAGCC by providing tactical vehicle maintenance to units training at the Center.

Building 1816 has not had a significant renovation or improvement project since constructed in 1981. The lack of improvements has led to deterioration of interior finishes, lighting, power, toilet facilities, and maintenance work areas. The roof and windows leak. The conditions have affected the quality of work of organization personnel. The personnel have been forced to overcome the lack of adequate and safe power. The renovations to Building 1816 will correct the deficiencies noted. The renovation work includes: repairing the roof; replacing the roof over the West wing of the building including replacement of flex conduit on roof, remove, cap and seal unused roof penetrations. Exterior man doors and roll-up doors will be replaced. Interior doors will be replaced with fire rated doors as required by code. Interiors will be painted. Floor finishes will be replaced. Interior doors will be refinished or replaced. Windows will be replaced and safety glazing provided in new windows.

245 High bay

245 2nd floor office

Filed Under: Complete Tagged With: 245

244 Design/Bid/Build Construct Billy Mills Sports Complex Baseball Field at NALF San Clemente Island, CA

September 14, 2015 by cflan12

2014-2015

The work includes renovations to the existing softball field and adjacent areas of the Billy Mills Sports Complex and incidental related work. Primary work shall consist of earthwork, sub-grade and drainage preparation for the installation of synthetic turf outfield, skinned infield, home place and baseline markings, galvanized chain link backstop and perimeter field fencing, metal foul ball poles, covered dugouts, concrete pads for future bleachers and accessible parking stall with d.g. path of travel to the bleachers. Existing bleachers and fencing at the site shall be removed.

 244 20150218_130433_resized

244 20150218_131359_resized

244 IMG_0464

244 IMG_0470

244 IMG_0512

Filed Under: Complete

243 Design/Build P281 Construct Engine Test Stand Facility at NBVC, NAS Pt Mugu, Ventura, CA

September 14, 2015 by cflan12

2014 – 2019

IMG_1548

IMG_1562

IMG_1563

IMG_1564

Photo 13

Photo 16

Photo 15

Photo 17

The P-281 Engine Test Stand Facility was a new construction project. This project consisted of constructing two reinforced concrete test pads for testing turbo prop engines and a 4,000 SF single-story ground support equipment building, and the demolishing the deteriorated existing test stand facility for the aviation division of the US Navy at Naval Air Station Point Mugu in Oxnard, California. The ground support equipment building created new admin offices, a maintenance workshop, restroom and shower facilities, lockers, and a break area. The construction consisted of split face and precision CMU, metal panel roofing, Sola-tubes and glass block for natural lighting, double-paned windows, motorized roll-up doors, and hollow metal doors and frames. Site improvements at this location, in addition to the two concrete test pads, included two fuel skid areas with concrete curbs, paved access roads for fuel trucks, parking spots and pavement markings, perimeter fencing with gates, site lighting, planting and landscaping, a trash enclosure, and a new extension and relocation of the existing jet blast deflector shield. New supporting site utilities were also installed including a transformer and switch gear, overhead electrical lines and poles, water distribution, and a new sanitary sewer line including a new manhole, and an oil-water separator.

Filed Under: Complete

242 Design/Build P378 Security Ops Complex & MWD Facility, MCAS Yuma, CA

September 14, 2015 by cflan12

2013-2017

This project consisted of the design and construction of a new Security/Operations facility with enclosed building area not to exceed 2,640 m² (28,417 ft²) and a Military Working Dog Facility with enclosed building area not to exceed 347 m² (3,735 ft²), on a site of approximately 2.9 acres. This was a ground up project and included all work from grading and foundations, MEP, all finishes and more.

 

 

 

Filed Under: Complete

241 Design/Build Renovate BEQs 781 & 782, NASNI Coronado, CA

September 14, 2015 by cflan12

2013-2017

The 1970’s constructed Bachelor Enlisted Quarters 781&782 is a 4-story building, with approximately 22,264 square feet. Each building holds sixteen (16) standard Type ‘A’ and sixteen (16) standard Type ‘B’ units with sixty-four (64) total bachelor quarters. This project includes, but is not necessarily limited to the repair of all unit interiors of two housing blocks, as well as the central support building comprising the complex. The project scope is to renovate the interior of the BEQ’s and install new finishes throughout the buildings.

 

Filed Under: Complete

240 Design/Build Fire Fighting Training Facility & Facility Drafting Tank, Palmdale, CA

September 14, 2015 by cflan12

2013-2016

This is a design-build project to provide Fire Fighting Training for the Air Force Plant 24 at Palmdale, CA. The project was awarded to include the design and construct an underground re-circulation drafting tank, holding a minimum of 15,000 gallons of usable water and have a depth between 13 to 15 feet at Air Force Plant 42, Palmdale, CA. This project also includes the design and construction of a Penetration Aircraft Skin Trainer (PAST) for the Fire Department training within the foot print of Air Force Plant 42 at Palmdale, CA. The facility includes site work, site drainage, electrical and gas to support the mission statement of this project.

 

Filed Under: Complete

239 Design/Build Renovate Unaccompanied Housing Bldg PH1478, Port Hueneme, CA

September 14, 2015 by cflan12

2013-2015

239 IMG_0358239 IMG_0384

 

 

 

 

 

 

239 IMG_0354

239 IMG_0355

This is a design/build project to renovate and provide repairs for PH1478, which is a 22,260 SF 3- story motel style Unaccompanied Housing (UH) unit constructed in 1995. The RFP anticipates that the facility will accommodate 90 sleeping units with two occupants per room when the project is complete. The upgrade includes the electrical, mechanical, fire protection, architectural layout conforming to a 2+0 sleeping unit design, removal of HAZMAT materials as well as a seismic upgrade to the structural system. The goal is to provide upgrades and a current code compliant facility. A total of six ABA accessible units are called-for in the RFP.

Filed Under: Complete

238 Design/Build PE12312R Install Window Film, MCB Camp Pendleton, CA

September 14, 2015 by cflan12


2013-2015

238 1397 a2

 

 

 

 

 

This project is for the installation of heat-resistant, sun-reflective film on the existing single pane clear glass windows and exterior glazing at doors on 81 buildings in 11, 13, 15, 16, 21, 33, 43, 53, and 62 areas of Camp Pendleton. These buildings are used for area command headquarters and various offices. The addition of window film provides privacy control, improves the comfort and significantly lowers cooling bills with Energy Saving.

Filed Under: Complete

237 Design/Build Replace Hospital Roof Bldg 1145, 29 Palms, CA

September 14, 2015 by cflan12

2013-2014

237 Kalwall  237 IMG_5476 237 IMG_5481

This is a Design/Build project that will provide for the re-roofing of the main building and an adjacent power plant building (approximately 88,500 SF), replacement of building expansion joints on the roof, installation of fall protection railing at two 25’ sections of roof edge, replacement of all sealant at exterior wall expansion joints and at windows and doors, replacement of ten sections of glass blocks with fiberglass translucent panel insulating system (FTPIS), and replacement of eight pyramid-shaped acrylic skylights with eight similar units constructed of FTPIS. The repairs provided will correct existing weather proofing deficiencies resulting from the harsh desert climate, and extend the serviceability of the exterior envelope for the next 30 years.

Filed Under: Complete

  • « Previous Page
  • 1
  • 2
  • 3
  • 4
  • 5
  • Next Page »
  • About Us
  • Experience
  • Awards
  • Estimating
  • Contact
  • Opportunities

© 2019 · I.E. Pacific, Inc. · Designed by Copish Boutique ·