251 Design/Build Modernize BEQ 01394 & 01396, China Lake, CA

November 18, 2015 by Lauren Zimmermann

2015-2018

This project will modernize the 38+ years old BEQ to Market-style apartments meeting the necessary requirements and will extend the useful life of BEQ Building 01394 to bring the facilities into compliance with facilities criteria for market style enlisted quarters. The construction shall have room patterns and floor areas similar to comparable private sector housing, including bedrooms, baths, living room, laundry and kitchen. The building will be occupied by able-bodied military personnel and a determination has been made that accessible units are not required in the building.

Filed Under: Complete Tagged With: 251

250 Design/Build Renovate Indoor Pool Area, China Lake, CA

November 18, 2015 by Lauren Zimmermann

2015-2016

This is a design/build project to provide upgrades to an existing indoor pool facility. Commencement of the work at the Indoor Pool in Building #00022 will be dependent on the calendar; per Base requirements, one of the two pools on Base must be open year round. The Indoor Pool cannot be closed for construction operations until the weather conditions allow the exterior pool to be opened.

img_5387

img_5394

This is a design/build project to provide upgrades to an existing indoor pool facility. Commencement of the work at the Indoor Pool in Building #00022 will be dependent on the calendar; per Base requirements, one of the two pools on Base must be open year round. The Indoor Pool cannot be closed for construction operations until the weather conditions allow the exterior pool to be opened.

Filed Under: Complete Tagged With: 250

249 Design/Build Repair Bldgs. B775 & QD773 at NASNI, Coronado, CA

November 18, 2015 by Lauren Zimmermann

2015-2017

The existing Barracks B-775 and the Quarterdeck B-773 buildings are located within the same complex with shared site amenities, circulation, parking along with a central mechanical room within B-773. The site is bound by S. ‘R’ Ave. to the northwest, a parking lot to the southwest, McCain Blvd. to the northeast, and S. ‘N’ Ave. to the southeast.

The goal of the project is to modernize and remodel the Barracks Building B-775 and Quarterdeck Building B-773. The current program includes 2+0 living units and support space on floors 2 through 4 of B-775, Administration offices and support spaces are on the first floor of B-775 and B-773 is where administrative personnel provides services to the housing complex users. The renovation of these facilities will bring each space up to code compliance, provide much needed finish upgrades, provide modifications to existing layouts to optimize program requirements and to provide structural enhancements to ensure the safety of the users.

Filed Under: Complete Tagged With: 249

248 Design/Build P593 Triton Maintenance Facility at NBVC, Point Mugu, CA

November 18, 2015 by Lauren Zimmermann

2015-2018

The goal of the project is to provide facility readiness for Program Mission of MQ-4C TRITON on the West Coast of the United States by Summer of 2015. The current program includes maintenance and training functions to be located at the Naval Air Station (NAS) Point Mugu. The project will provide a centralized maintenance hub and infrastructure needed to support the program.  The project renovates half of hangar 34; builds a launch and recovery facility; renovates a space for a composite shop; builds a battery locker, builds a warehouse; expands a power check pad; and expands a wash rack.

Filed Under: Complete Tagged With: 248

247 Design/Build P957 H60 Trainer, Naval Base Coronado, CA

November 18, 2015 by Lauren Zimmermann

2014- 2016

This was a design/build project to provide a new addition to expand an existing helicopter training facility at Naval Base Coronado. The project consisted of designing a prefabricated structure abutting an existing masonry facility, providing an addition 24,000+ square feet of facility to house additional helicopter trainers in the expanded bays.

IMG_9082

IMG_9202

IMG_9220

IMG_9243

IMG_9245

 

Filed Under: Complete Tagged With: 247

246 Design/Build Renovate Bldg. 302, Naval Base Point Loma, CA

November 18, 2015 by Lauren Zimmermann

2014-2016

This is a design/build project providing renovations to Building 302 at Naval Base Point Loma, San Diego. Building 302 is a seven story, permanent housing facility constructed in 1974. Each floor level contains three living units. Each living unit has a shared lounge and 4 sleeping rooms accessed from the lounge. There are a total of 84 sleeping rooms. Five sleeping rooms and adjoining restrooms will be made ABA compliant.

Each living unit is accessed by a walkway along an inner courtyard. Floor levels are vertically connected by two elevators located at Stair #3. Stair #2 has roof access ladder and hatch located at seventh floor landing.

In addition to the renovations to Building 302, upgrades to a second floor Mechanical / Electrical Room located in Building 300 have been identified. Building 300 is located northwest of Building 302, and contains laundry, lounge and office areas on the first floor, and Mechanical, Electrical, Telephone and Security services on the second floor.

img_2952

img_1278 B302

img_1287 B302

img_1259 B302

Filed Under: Complete Tagged With: 246

245 Design/Build Repair Auto Org Shop 1816, 29 Palms, CA

November 18, 2015 by Lauren Zimmermann

2014 – 2016

Building 1816 is a tilt-up concrete building constructed in 1981 as an organizational maintenance facility for various Marine Corps tactical units stationed at the Marine Corps Air Ground Combat Center (MCAGCC). The facility supports the mission of MCAGCC by providing tactical vehicle maintenance to units training at the Center.

Building 1816 has not had a significant renovation or improvement project since constructed in 1981. The lack of improvements has led to deterioration of interior finishes, lighting, power, toilet facilities, and maintenance work areas. The roof and windows leak. The conditions have affected the quality of work of organization personnel. The personnel have been forced to overcome the lack of adequate and safe power. The renovations to Building 1816 will correct the deficiencies noted. The renovation work includes: repairing the roof; replacing the roof over the West wing of the building including replacement of flex conduit on roof, remove, cap and seal unused roof penetrations. Exterior man doors and roll-up doors will be replaced. Interior doors will be replaced with fire rated doors as required by code. Interiors will be painted. Floor finishes will be replaced. Interior doors will be refinished or replaced. Windows will be replaced and safety glazing provided in new windows.

245 High bay

245 2nd floor office

Filed Under: Complete Tagged With: 245